The Precast Concrete lintels went into the wind and door openings and the masons finished the rest of the block.
This is looking into the back of the house. The worker is standing right over the front door.
This is the front of the house. What you can see of it- 2 car garage on the right, 1 car in the middle, and you can see the entry on the left.
This is the west wall, towards the front of the garage. The first window is Owen's bedroom, then our water closet (the little room with the door that the toilet is in), then the 4' x 4' picture window over the tub in the master bathroom.
We have no idea how, but the huge CastCrete beam over the lanai was lifted by hand from the ground to where it is now. This was in the front yard yesterday.
Pete is looking up at that beam wondering how they got it up there (It's solid poured concrete!!!)
This is the back corner of the house. The window on the right is in Sarah's bathroom. The two square windows are in the dining room, and on the left is the back dining window.
Looking at the entryway.
No comments:
Post a Comment